Address: Camp Lejeune, NC
Project Responsibility: Structural Engineering Design
MMSA provided structural design for a vehicular bridge spanning more than 300 feet crossing over Beaver Dam Creek and a protected wetlands area located on the Marine Corp Base, Camp Lejeune. The vehicular bridge consists of prestressed concrete cored slabs supported on cast-in-place concrete bents spaced at 50-feet intervals. The cast-in-place concrete bents are supported on 12-inch square prestressed concrete piles. The bridge was designed in accordance with the AASHTO LRDFD Bridge Design specifications for seismic performance Zone 1.